WPL-A 07

  • CMT - Commercial Modular Trend configurations
  • Medium to large commercial hot water offerings
  • Inverter technology provides adjusted heating output
  • R454C refrigerant
  • High flow temperatures of up to 75 °C enable high DHW temperatures and mixed water volumes
  • Low operating costs through high efficiency all year round
  • Smart Grid ready for connection to solar PV and energy management systems
  • Backed by Stiebel Eltron warranty and after-sales support

 

Ask Quick Question

Product Overview

Prefabricated Skid Overview
In addition to free installation layout using our modular components, STIEBEL ELTRON offers a prefabricated skid system variant designed to accelerate deployment, ensure build quality, and maintain flexibility to meet the specific needs of your project. The set up will reduce on-site time, costs, and risks, while delivering consistency and high-quality execution.  prefab logo

Prefabricated Skid
Save time, provide a fast and reliable install, and avoid ambient risk factors with a product that has been pretested in the factory.

Full Skid
This turnkey solution includes a complete heat pump and tank assembly mounted on a structural steel skid. All hydraulic and potable water connections, electrical wiring, insulation, and commissioning checks are completed at the factory. The system is pre-tested, pressure tested and supplied with insulation and a crane lifting certificate. This package is ideal for projects requiring fast, hassle-free installation with minimal site coordination or trades.

 

prefab skid and table

 

The hot water plant shall be supplied as a full skid-mounted system. All hydraulic and potable water pipework, insulation, and electrical connections shall be factory-installed, pressure tested, and pre-commissioned. The system shall include all necessary thermal insulation, crane lifting points, and certification for transport and rooftop installation. The skid shall be delivered as a plug-and-play solution requiring only connection of mains power, cold water inlet, hot water outlet, and ring main return. 

 

schematic cmt

CMTsizing

 

Product Details

For planning or sales enquiries, contact us on ask a question below. 

Technical Data

Name Unit QTY Tanks Heating Cylinder Volume Min. Spatial Requirement (sqm) Dry Weight (KG) Wet Weight (KG) Connected Load (A) Peak Draw (kW) Electrical Box Sub Main
CM-T-11 WPL-A 07 1 1 829 5.78 506 1674 50 11.7 20/PH 415V
CM-T-22  WPL-A 07  2 2 1658 9.02 937 2948 90 23.4 32/PH 415V 
CM-T-33  WPL-A 07  3 3 2487 16.22 1368 4222 130 35.1 40/PH 415V 
CM-T-44  WPL-A 07  4 4 3316 14.92 1799 5496 170 46.8  63/PH 415V 
CM-T-55  WPL-A 07  5 5 4145 19.51 2239 6770 210 58.5 80/PH 415V 
CM-T-66  WPL-A 07  6 6 4974 23.30 2661 8044 250 70.2 100/PH 415V 

Downloads

File Category Type Download
CHW Technical Catalogue Brochure PDF
9.73 MB
CHW Solutions Brochure PDF
4.13 MB
CHW Clearances Operation and Installation Guide PDF
1.34 MB
Package Skid Overview - CMT66 Data Sheet PDF
1036 KB
Package Skid Overview - CMT55 Data Sheet PDF
1055 KB
Package Skid Overview - CMT44 Data Sheet PDF
777 KB
Package Skid Overview - CMT33 Data Sheet PDF
713 KB
Package Skid Overview - CMT22 Data Sheet PDF
697 KB
CHW Skid Drawing - CMT66 Technical Drawing PDF
212 KB
CHW Skid Drawing - CMT55 Technical Drawing PDF
204 KB
CHW Skid Drawing - CMT44 Technical Drawing PDF
186 KB
CHW Skid Drawing - CMT33 Technical Drawing PDF
177 KB
CHW Skid Drawing - CMT22 Technical Drawing PDF
137 KB

FAQ

Ask Quick Question

Quick Enquiry Form
FREE CALL
1800 153 351


Select enquiry type above to begin.

Service Request Form

Security Request Form

Warranty Request Form